Project
CIF is a company specializing in the manufacture of bags, threads, twines, and ropes for the agri-food industry. To reduce its carbon footprint and energy costs, CIF is exploring various solutions to self-produce energy from renewable sources. .
GPE carried out a complete feasibility study for a 3 MW wind turbine project intended to power its factory in Tangier.
Our expertise
- Analysis of the regulatory framework and site constraints
- Analysis of the plant's demand and the wind turbine's production profile
- Energy yield estimation
- CAPEX/OPEX estimates
- Project design & layout preparation
- Accessibility and grid connection study
- Project profitability analysis