Gouy Les Piétons - 6 Nordex N131-3.6 MW

Owner’s engineering - construction & commissioning

Project

The Gouy Les Piéton wind farm, consisting of six Nordex N131 turbines, is located on an agricultural plain in the municipality of Courcelles.  

GreenPlug provided owner’s engineering support during the construction phase, up to the commissioning of the wind turbines..

Our expertise 

  • Management of the EPC contract with the turbine manufacturer (budget, planning)
  • Review of the road survey and BOP design
  • Installation methodology review & optimisation (pre-installation)
  • Main Component quality inspections at delivery on site
  • WTG inspections before Take-Over on behalf of the Owner
  • Verification of Run Test based on SCADA data analysis Defects and punch-listing



     SCADA des éoliennes
  • Contrôle et suivi de la liste des réserves