Rehabilitation of the RUZIZI I hydropower plant (30 MW)

Techical study - DRC



Our expertise

The study focuses on preparing the technical documents required by the client (SNEL S.A.) and the funding agencies. This includes defining and limiting the technical scope of the rehabilitation, estimating costs, the schedule, risks, and expected positive impacts.

  • Review of existing documents
  • Study on increasing the power output of the power plant
  • Inspection of the Ruzizi I power plant and associated 15kV and 70kV substations 
  • Coordination with the Environmental and Social Study
  • Drafting the concept for the Ruzizi I Hospital Rehabilitation Project