Skip to Content

Mpatamanga Hydropower project (350 MW) - Malawi

Hydrology / Sediment / Water quality analysis / Monitoring stations



Our expertise

  • Design of 7 sediment and gauging stations
  • Installation of 7 water level gauge 
  • Installation of 3 automatic gauging and turbidity measurement stations
  • Collection of water samples and analysis of suspended sediments (pumping/filtration)
  • Flow measurements (ADCP) to establish rating curves
  • Water quality analysis - 32 parameters (12 x per year)


Sign in to leave a comment