Skip to Content

Fula Rapids Hydropower project (38MW vs 140MW)

High level desktop study - South Sudan



Our expertise

  • Review of 2012 feasibility study, in particular check elevations, amend the project if needed (annual production / optimized output / technical design)
  • High level comment on CAPEX and OPEX for plant construction and transmission line
  • proposal on installed capacity 
  • Estimation of optimum level of reservoir
  • Alternatives study (38 MW / 140 MW)
  • Calculation the impact on Grand Fula’s power, energy production and storage capacity


Sign in to leave a comment