Skip to Content

Gogo Hydropower Plant (8.6 MW) - Kenya

Feasibility Study for the redevelopment


Our Expertise

  • Market Study
  • Topographic, Geotechnical, and Hydrological Surveys
  • Audit of Existing Infrastructure and Equipment
  • Analysis of Alternatives and Design
  • Optimization of Reservoir Storage and Production
  • Economic and Financial Study
  • ESIA

2 Kaplan turbines / 8.6 MW





Sign in to leave a comment