

Feasibility Study for the Redevelopment of Gogo Hydropower Plant (8.6 MW) – Kenya
- Market analysis
- Topographic, geotechnical and hydrological studies
- Due diligence of existing infrastructure and equipment
- Variant analysis and design
- Optimization of storage capacity of the reservoir and producible
- Economic and financial study
- ESIA
2 turbines / 8.6 MW